Step
Action
-
Switch on the voltage. Check that voltage on LED (7) lights up.
-
Open the air outlet valve.
-
Press start button (10) on the control panel. The compressor starts running and the
automatic operation LED (3) lights up. After the motor running time in star (Y-time, see
Parameters in section Programmable settings) has elapsed, the drive motor switches over
from star to delta and the compressor starts running loaded.
5.4
During operation
Warnings
The operator must apply all relevant
Removing the front panel (service panel) during operation will lead to an automatic shutdown
of the unit after a certain time depending of the compressor version.
Keep the doors closed during operation; they may be opened for short periods only to carry
out checks.
When the motors are stopped and LED (3) (automatic operation) is alight, the motors may
start automatically.
Instruction book
2920 7101 21
67
Summary of Contents for QGS 40
Page 1: ...QGS 40 QGS 50 QGS 60 QGS 75 QGS 100 Instruction book Oil flooded rotary screw compressors...
Page 2: ......
Page 100: ......
Page 101: ......