Section III - Installation
Water and Sewer Facilities at the In-
stallation Site (water-cooled models)
Clean, soft and/or treated water is required
to ensure the efficient, long service life of
the water-cooled heat exchangers.
It is strongly recommended that a
reputable, local water treatment company
be engaged prior to start-up to establish
the corrosion, scale forming and fouling
tendency of the cooling water and remedy
the situation if a problem exists.
notiCe!
Failure to develop a water treatment
p l a n m a y r e s u l t i n i n c r e a s e d
maintenance and operating expense,
reduced equipment life and emergency
shutdown.
Make sure the water supply is connected
and open. Piping supplied by the user
should be at least equal to the connections
provided on the compressor. Sewer
facilities should be readily accessible
to the installation site and meet all the
requirements of local sewer codes, plus
those of the compressor. Make sure
water inlet and discharge connections are
correct.
notiCe!
A water temperature regulating valve is
located in the discharge water line.
6
Quincy Compressor-QGV Series
Summary of Contents for QGV-100
Page 2: ......
Page 6: ......
Page 17: ...Section II Description This page intentionally left blank Quincy Compressor QGV Series 11 ...
Page 74: ...Appendix A Dimensional Drawings QGV 50 air cooled 68 Quincy Compressor QGV Series ...
Page 75: ...Appendix A Dimensional Drawings QGV 50 water cooled Quincy Compressor QGV Series 69 ...
Page 76: ...Appendix A Dimensional Drawings QGV 75 100 air cooled 70 Quincy Compressor QGV Series ...
Page 77: ...Appendix A Dimensional Drawings QGV 75 100 water cooled Quincy Compressor QGV Series 71 ...
Page 78: ...Appendix A Dimensional Drawings QGV 150 200 air cooled 72 Quincy Compressor QGV Series ...
Page 79: ...Appendix A Dimensional Drawings QGV 150 200 water cooled Quincy Compressor QGV Series 73 ...
Page 89: ......