Section IV - Operating Procedures
Place the program cartridge into the
2.
socket and restore power.
The PLC run status lights will be yellow
3.
for a second or two, then turn green.
That signifi es that the program has been
copied.
Power down and remove the program
4.
cartridge, and replace the cover blank.
NOTE: This operation will clear any
5.
internal logs, times and confi gurations
and set them to default settings.
If the cartridge is not removed, the
6.
program will reload every time the power
is cycled, and over-write all settings.
eMail Module for QSIi
Connect to L+ (24 Vdc)
Connect to M (DC Common)
Ethernet Cable
connects here.
Connect to S7
controller.
29
Summary of Contents for QGV-20
Page 2: ......
Page 70: ...Appendix A Dimensional Drawings QSI 90 120 140 micro 66...
Page 71: ...Appendix A Dimensional Drawings QSI 90 120 140 micro dry 67...
Page 72: ...Appendix A Dimensional Drawings QSI 90 120 140 micro tank mounted 68...
Page 73: ...Appendix A Dimensional Drawings QSI 90 120 140 micro dry tank mounted 69...
Page 74: ...Appendix A Dimensional Drawings QSI 90 120 140 guage 70...
Page 75: ...Appendix A Dimensional Drawings QSI 90 120 140 guage dry 71...
Page 76: ...Appendix A Dimensional Drawings QSI 90 120 140 guage tank mounted 72...
Page 77: ...Appendix A Dimensional Drawings QSI 90 120 140 guage dry tank mounted 73...
Page 78: ...Appendix A Dimensional Drawings QGV 20 25 30 460V 74...
Page 79: ...Appendix A Dimensional Drawings QGV 20 25 30 460V dry 75...
Page 80: ...Appendix A Dimensional Drawings QGV 20 25 30 460V tank mounted 76...
Page 81: ...Appendix A Dimensional Drawings QGV 20 25 30 460V dry tank mounted 77...
Page 91: ......