background image

-

of 2 -

2

INSTALLATION

Your installation is now complete!  Restore electricity and save this sheet for future reference.

5

Install Shade

Incorrect

base/ socket/

shade Orientation

Correct

base/ socket/

shade Orientation

Shade

Socket

Base

Socket

Base

Shade

* Make sure the shade, sockets and base are in the same

orientation after assembly (refer to the following diagram).

1

Install Base and Socket
Assembly together

2

Install Bulbs

Install two correct bulbs referring to
fixture markings and/or labels for
maximum wattage.

Recommended Bulb Type (not
included):

BULB BASE TYPE

Medium (E26)

BULB TYPE

TYPE A

75W

MAX

Cable

3

Install Nipple with
Hex Nut

4

Install Spacer Tube
and Check Ring

* Pull the cable out of the base from the

base during assembly.

Small Knurled Nut

Big Knurled Nut

Flat Washer

Rubber Washer

C

SA

Reviews: