-
of 2 -
2
INSTALLATION
Your installation is now complete! Restore electricity and save this sheet for future reference.
5
Install Shade
Incorrect
base/ socket/
shade Orientation
Correct
base/ socket/
shade Orientation
Shade
Socket
Base
Socket
Base
Shade
* Make sure the shade, sockets and base are in the same
orientation after assembly (refer to the following diagram).
1
Install Base and Socket
Assembly together
2
Install Bulbs
Install two correct bulbs referring to
fixture markings and/or labels for
maximum wattage.
Recommended Bulb Type (not
included):
BULB BASE TYPE
Medium (E26)
BULB TYPE
TYPE A
75W
MAX
Cable
3
Install Nipple with
Hex Nut
4
Install Spacer Tube
and Check Ring
* Pull the cable out of the base from the
base during assembly.
Small Knurled Nut
Big Knurled Nut
Flat Washer
Rubber Washer
C
SA