DTUTT1K2HP1D
ELETTRONICA
5
/ 30
User Manual
Rev. 1.0 - 18/06/12
5. Installation and Use
This chapter contains the basic instructions for installing and using the
DTUTT1K2HP1D
. If necessary, more depth information about the operating
principles may be found in the components’ manuals.
5.1 Installation
For practical reasons and for transport safety, the machine can be supplied
disassembled to the customer. The assembly procedure is rather simple and can
be carried out by any qualified technician.
Note:
In order to avoid the risk of damaging the machine and/or of injuring the
operators, it is advisable to closely adhere to the instructions provided below.
always respect all the safety regulations and standards in force.
Unpack the transmitter and before any other operation check that the equipments
hasn’t been damaged during transport and all the controls and connectors on the
front and rear panels are in good condition.
To install the
DTUTT1K2HP1D
transmitter please refer to the relative technical
dossier, particularily about:
• Mains supply connection
• RF connections
Perform the connections following the instructions and schematics given in the
station’s documentation (technical dossier).
5.2 First Start
This section describes the procedure for powering-on the machine the first time.
For a description of the power up procedure of the single amplifiers in the different
cases, of the use of the exciters and of the hybrid combiner, please consult the
relative manuals.
5.2.1 Preliminary Operations
Before activating the apparatus, please perform the necessary connections, that
is:
• Power supply
• Splitter-Coupler section
• Modulating signals
• RF amplifier section and load