Operation
Avoid taking sharp curves during operation and
always raise the implement before reversing.
The lower links of the tractor should be positioned to
one side; limit any lateral movement on steep slopes.
Bring the implement frame into horizontal position by
adjusting the length of the top link.
Move the combination to ”float”; the position of the
top link will act on the roller pressure:
… steep incline of top link to implement – less roller
pressure
… level incline of top link to implement – more roller
pressure.
Working depth of harrow:
in the perforated jibs (
6/
1
), pre-select using the connector – set all to the
same value.
Levelling board:
The spring-mounted tined levelling
board levels and ”breaks up” rough clods of earth. It is
led regardless of the working depth of the harrow;
… make any necessary height adjustments at (
7/1
)
(do not allow any walls of earth to be shunted from
the front)
… each tine (
7/2
) can be adjusted individually.
Track looseners
: (rigid or spring-mounted) – adapt
these to the necessary track width.
The depth control is pin adjustable (
7/3
)
- do not set the looseners too deep.
The loosener shares are reversible.
Overload backup on rigid looseners: splint pin 8 x 50
mm.
Fully raise the looseners on the ”
9 m
implement”
before transporting.
Dismantling / Parking
The implement may be parked folded out or folded in
(secured for transport) – on rollers or supporting legs
(
9/1
); the rear support leg also used for ”
9 m”
implements (
8/1
)
Ensure the implement is on solid ground!
Keep the hydraulic coupler free of dust.
9
6
7
8
1
1
2
3
1
1
5