1269 User Manual
Configuring The 1269 2-13
Installing The
Mainframe W/Opt
01 Into The Rack
Assistance of a second person will be needed to align and
engage the mainframe with the slide assemblies in the rack.
1.
Install the mainframe with its two attached instrument
rails onto the quick disconnect slide mount assemblies
(installed in the instrument rack). Be sure the
mainframe is properly aligned and square with the slide
assemblies. Remember to depress the locking buttons
when inserting the instrument rails into the slide mount
assemblies. When properly installed, the instrument
should slide freely on the slide rails. If binding occurs,
slide bracket-to-rack rail mounting screw should be
loosened and re-adjusted to relieve binding.
2.
The following assembly is required to lock the
instrument into its operating position in the rack:
a.
If rack rail is not tapped, slip two self-anchoring
#10-32 retaining nuts (Item 9) onto the mounting
rail of the rack (each side). These nuts should
be aligned with the slots in the rack mounting
ears previously attached to the mainframe (Items
5 and 7).
b.
Slide the instrument fully into the rack until the
rack mounting ears strike the slide screws or
front rail. Secure the instrument in place using
two (each side) Phillips Panhead #10-32 x 3/4
screws (Item 15).
Slide Rack mount Installation is now complete
.
Installation of
Option 04, Rack
Ears
Table 2-2
, below, lists the items included in this kit (P/N
407507)
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com