The  Racepak  DataLink  program  you  see  on  your  computer monitor  is  actually  composed of  four screen panes. 

Across the top of the screen is the pane containing the Run File tabs and the Channel Buttons. The middle portion of the 
screen contains the graph pane. The pane at the bottom of the screen contains the tabs and the log pages associated with 
the run file currently being displayed. Finally, on the left side of the screen is the icon toolbar. You have the ability to resize 
the height of all of the pane sizes except the toolbar. You can even set up a selection of pane size combinations that allow 
you to scroll from one combination to another by clicking on an icon. 

TO SET THE INITIAL SCREEN PANE SIZE 

 

Step  1: 

Open a run file. Then 

click  on  Settings 

and 

Screen  Sequence  Sizes 

at the top of the screen. This will 

bring up the Edit Screen Size Sequence box. 

Step  2: 

Note that the Edit Screen Sequence box has four columns: Enabled, Channel Size, Graph Size, and Log 

Size. Click to 

delete all checkmarks in the Enabled column except the top row

. This will allow you to work on 

just the first screen sequence size that appears when you open a file. 

Step  3:  Change  the  Channel  pane  size 

by clicking on the Channel Size box in row one and typing in the new 

pane  size  (Example,  18).  The  number  you  type  will  be  the  percentage  of  the  screen  you  want  to  allot  to  the 
Channel pane. Don’t worry if you don’t get it right the first time. You can adjust this number later suit the number 
of channel button your system contains. 

Step  4:  Change  the  Graph  pane  size 

by clicking on the Graph Size box in row one and typing in the new pane 

size  (example,  74).  Notice  that  as  you  do  this  the  number in  the  Log  Size  box  will  automatically  change so  the 
total of the three boxes in the row will equal 100%.  

Step 5: Click OK 

button. 

 

Step  6: 

On  the  toolbar 

select  the  Organize  Panes 

icon.  When  you  click  on  this  icon  the  screen  panes  will 

change to the new sizes you have assigned to them. 

SCROLLING TO DIFFERENT SCREEN PANE CONFIGURATIONS

 

 

Another feature of the programmable screen pane sizes is the ability to scroll from one set of screen pan sizes to 

another while the file is open. For example, from your initial screen page configuration you may want to enlarge the Log 
Pane size so you can view the full log page for whichever tab is selected. Rather than clicking on the bar above the log 
page tabs and dragging it upward, which will reduce the graph pane and enlarge the log page pane, you can do this with a 
single click of the mouse.  

Step  1: 

Open a run file. Then 

click  on  Setting 

and 

Screen  Sequence  Sizes 

just as you did when setting the 

initial screen pane sizes. This will again display the Edit Screen Size Sequence box. 

Step 2: Enable row #2 

on the Edit Screen Size Sequence box by clicking on the Enable Box for that row. 

Step  3:  Repeat  steps  3  through  5  from  above

. Start by assigning the Channel Size box to 18% and the Graph 

Size box to 14%. This will enlarge your Log Page pane to 68%.  

 

Step  #4: 

On the tool bar 

select  the  Organize  Panes 

icon.  When you repeatedly click on this icon the screen 

panes will scroll back and forth between the sequences you have assigned on rows #1 and #2.  

 
 

Using this procedure will allow you to assign up to eight different selections of screen pane size configurations. 

Summary of Contents for V300SD

Page 1: ...Pane Sizes 13 Creating And Viewing Quick Graphs 14 Security Keys Accessing 15 Security Keys Adding 16 Adding New V Net Sensors 17 USING Viewing The Run Log Pages 18 Overlaying Run Files 19 Zoom In Zoo...

Page 2: ...recorder starts logging data so plan accordingly In most cases the V300SD recorder has far more memory than is required so it is unnecessary to delay the start of your recording until the last moment...

Page 3: ...combination of the type of recorder you have V300SD and your recorder s serial number a four digit number such as 1001 The Open dialog box will appear For users with the generic V300SD select the gen...

Page 4: ...and track by selecting the correct information from the selections list If the desired year and or track name is not on the corresponding selection list you can enter the new year or track by typing t...

Page 5: ...screen and continue Step 8 Select OK or Next depending on your configuration file Additional dialog boxes may be displayed These are part of the Run Log sections that are user programmable to allow te...

Page 6: ...ng Step 11 You should now see the real time telemetry screen on your monitor To start the program click on the Start Data Acquisition icon or click on Telemetry and then Run To start the real time ses...

Page 7: ...and click on OK Your configuration file is now open Step 5 Click on Settings then select Scan COM Ports Make sure the data logger is powered on and the communication cable is connected Step 6 A Messa...

Page 8: ...e by double clicking on the time display Step 2 Once you have set the correct time and date in your PC you can start the Racepak DataLink software In the Datalink software open your car configuration...

Page 9: ...ing when performing this task Step 1 Click the Start button on the task bar at the lower left corner of your screen Step 2 Select Settings Step 3 Select Active Desktop Step 4 Click on Customize My Des...

Page 10: ...Properties box In this box you can verify the current settings and make any necessary changes Step 8 Click Save Step 9 Close the car configuration file SETTING THE START TIME The start time or zero po...

Page 11: ...locate the User Scale Begin Time s window You can change the starting time of the screen display by highlighting this window and typing in the new start time Step 3 Directly below the User Scale Begi...

Page 12: ...d vertical lines that appear when you use the averaging feature If you are unfamiliar with this feature see Using The Averaging Feature Step 3 Experimenting with different combinations is easy Click o...

Page 13: ...hange the Graph pane size by clicking on the Graph Size box in row one and typing in the new pane size example 74 Notice that as you do this the number in the Log Size box will automatically change so...

Page 14: ...Type Quickgraph Name dialog box will appear on your screen Step 4 Click on the top window of the Select Name Quickgraph Name box Step 5 Type in the name you want to assign to the selection of channel...

Page 15: ...are in the Currently Installed Serial Numbers window of the Add Security Unlock Keys box They are in the columns titled HW Type Serial Number and Unlock Key Write these numbers down exactly as they a...

Page 16: ...new security key numbers Step 2 From the main menu bar select Security and then Show Edit Security Key List The Add Security Unlock Keys dialog box will then appear Step 3 In the Add Security Unlock K...

Page 17: ...n be identified by the file tab at the top of the screen containing your configuration number and the picture of a blue wrench Step 4 Connect the computer to the onboard recorder using the serial cabl...

Page 18: ...different screen pane percentages the chances are that at least one of the Organize Panes selection will bring the log pages and their tabs back into view Step 2 If the first method does not produce...

Page 19: ...ph lines that will be compared with another file Step 3 Click on the Open File Folder icon Step 4 Proceed as you normally would to open the file you want to compare to the one that is already displaye...

Page 20: ...ur mouse This method will magnify the area within the box to full screen view in one step Step 1 With the run file displayed on your screen locate the area you want to enlarge Step 2 With your mouse m...

Page 21: ...ursor Step 1 Open a run file Step 2 Click on the channel button to display the graph line for the function you want to average for example the Engine RPM channel Step 3 Set your screen cursor to the l...

Page 22: ...f the folders you want to open until the name of the file you want to copy is visible Step 4 Highlight the file you wish to copy Step 5 Right click on the highlighted file A drop down menu selection w...

Page 23: ...t and then a period of time to search through all of your files A rotating magnifying glass icon will indicate that the search is taking place When the search is finished a list of all files matching...

Page 24: ...24 866 464 6553 1350 Pullman Drive Dock 14 El Paso Texas 79936 www racepak com 07 18 07...

Reviews: