910084-M
Trak Kut II Saw
Phone: (262) 637-9681
Email:
custserv@racinerailroad.com
www.racinerailroad.com
10.2018 Rev 1
Page 11
Daily Inspection
Before starting any cutting operation, perform a daily inspection.
Before operating the Trak Kut II saw, inspect the following and correct any problems as necessary:
•
Check the general condition of the machine.
•
Check that all guards and safety devices are installed and operational.
•
Check that all controls are operational.
•
Check that the rail clamp device is operational.
•
Check that the ending fuel level is full.
•
Check that the engine air filter element is clean and serviceable
Operating Instructions
The Trak Kut II can cut rail from both sides by turning the saw around and reinsert it in alignment with the
same cut without moving the rail clamp thereby using most of the cutting blade.
The typical rail cutting time for 16-inch saws for a 132 lbs. rail is approximately 1.50 minutes.
Rail Top Cutting Method
Rail Side Cutting Method
Engine Start
1. Toggle the Off switch back, opposite the OFF decal.
2. Pull the Choke out to the choke position.
3. Grasp the rope handle and slowly pull until resistance is felt.
4. Then pull rapidly to start engine and avoid kickback.
Note:
If the Choke is used, rev the Throttle trigger to RUN in a responsive manner as engine warms
up.
5. Reset the choke after the engine is warm and accelerates smoothly.
6. Operate the engine at full throttle when cutting a rail.