7
8. The mixer must necessarily be unplugged before:
(1) Relocation and transport
(2) Cleaning, servicing and repair
(3) Failure removal
(4) Check the connecting cables if not knotty or damaged
(5) Leaving (even in case of short interruption)
STORAGE
Keep any equipment not being used in dry and locked spaces.
TRANSPORT
Move the concrete mixer with trailer.
WORK INSTRUCTIONS
Mixture production:
1. Add water and a couple of additive shovels (sand, gravel, etc.)
2. Add a couple of binder shovels (cement, lime, etc.)
3. Repeat points 1 and 2 until the required mixture ratio is achieved.
4. Let the mixture mix up properly.
5. Ask for advice from a professional for the mixture composition and quality.
SYMBOLS
Caution!
Read the operating instructions to reduce the risk of injury.
Always wear goggles when using the machine.
Wear gloves!