background image

Step 1. 

Rail Attachment: Attach the Inner Rail to the chassis by aligning the Shoulder 

Lugs with the keyholes in the Inner Rail, then slide toward the front of the server. 

Install supplied M4 pan head screw as shown to secure inner rail to the chassis. 

Right side is shown, Left side is labeled "L". Repeat for the other side

2Post Center Installation Instructions

Step 2. 

Attach Rear Brackets: Attach the Rear Brackets to the Outer Rail Assemblies, 

using included 8-32 flat head screws and keps nuts. Ensure they are set to the 

required "Mounting Depth".

Page 4

Inner Rail

Labeled "R"

Lug

M4 x 6mm Pan 

Head Screw

Outer Rail

Rear Bracket

8-32 x.312 Flat Head Screws

8-32 Keps Nuts

4Post Installation Instructions

Step 4. 

Install the equipment: Slide the equipment all the way in.  Tighten the (2) Pan 

Head Screws on the back of the left slide rail.  Slide the equipment out about 8 

inches and tighten the (2) Pan Head Screws on the front of the left slide rail.

Note: 

When tightening the loose rails, support the bottom of the server to ensure proper 

rail adjustment.

Reviews: