SECTION 7: U-T
UBE
H
EATER
I
NSTALLATION
31
Step 7.5 Couplin
g
and Tube Assembly
Step 7.5.1 Couplin
g
and Tube Assembly (Continued)
Tube
Tube
Orient coupling so that
the impact block is in the
2:00 or 10:00 oclock
positions
Closed
Open
Tab
76 mm to
101 mm
Slide Bar
Coupling
Wide End
Coupling
Tube
Slide Bar
A
Close co
u
pling
w
ith tab.
B
Start slide bar/co
u
pling lock
onto co
u
pling.
C
Insert t
u
bes into co
u
pling.
D
Tighten co
u
pling to join t
u
bes.
Description
Part N
u
mber
Co
u
pling
01329600
Slide Bar/Co
u
pling Lock
01329700
T
u
be
91409408
Incorrect Slide Bar
position
Correct Slide Bar
dimensions
± 50 mm
Drive slide bar until tight.
End of slide bar should be
within tolerance listed below.
• Repeat
Step 7.5
A - D until all tubes are assembled.
Ti
g
hten slide bar as shown below.
Summary of Contents for BH15UT
Page 2: ......
Page 4: ......
Page 6: ......
Page 33: ...SECTION 7 U TUBE HEATER INSTALLATION 27 Figure 23 U Tube Assembly Overview mm 200...
Page 55: ...SECTION 10 OPTIONAL HEATER ACCESSORIES 49 Figure 28 U Tube Angle Mounted Figure 29 Linear...
Page 71: ...SECTION 16 TROUBLESHOOTING 65 Troubleshooting Flow Chart Linear Double Linear and U Tube...
Page 73: ...SECTION 16 TROUBLESHOOTING 67 Troubleshooting Flow Chart Multiburner...
Page 81: ......