RADIANT SERVICES™ I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
48
10.7 Wall Mountin
g
Install
w
all mo
u
nting brackets at the height sho
w
n in the
layo
u
t dra
w
ing pro
v
ided by the estimator. Space
w
all
mo
u
nting brackets and hangers as indicated by
dimensions d, e and f (
u
-t
u
be) in the rele
v
ant layo
u
t
o
v
er
v
ie
w
dra
w
ing for yo
u
r heater. For linear heaters
see
Page 15, Figure 20
, for do
u
ble linear heaters
see Page
18, Figure 22
and for U-t
u
be heaters
see Page 28, Figure
24
.
10.7.1
Hard
w
are Installation
The
w
all mo
u
nting brackets m
u
st be attached to a
s
u
itable
w
all thro
u
gh all mo
u
nting holes. Scre
w
sizes less
than M8 (5/16") may not be
u
sed. In order for the
w
all
mo
u
nting brackets to adeq
u
ately carry the
w
eight of the
heater, it m
u
st be installed
w
ith best b
u
ilding practice.
Fi
g
ure 27: U-Tube (Horizontal)
Model
Q
u
antity of Wall
Mo
u
nting Brackets
Model
Q
u
antity of Wall
Mo
u
nting Brackets
BH15UT
2
BH15ST
3
BH20UT
3
BH20ST
4
BH25UT/EF
3
BH25ST/EF
4
BH30UT/EF
3
BH30ST/EF
5
BH35UT/EF
3
BH35ST/EF
5
BH40UT/EF
3
BH40ST/EF
5
BH45UT/EF
4
BH45ST/EF
6
BH50UT/EF
4
BH50ST/EF
6
Summary of Contents for BH15UT
Page 2: ......
Page 4: ......
Page 6: ......
Page 33: ...SECTION 7 U TUBE HEATER INSTALLATION 27 Figure 23 U Tube Assembly Overview mm 200...
Page 55: ...SECTION 10 OPTIONAL HEATER ACCESSORIES 49 Figure 28 U Tube Angle Mounted Figure 29 Linear...
Page 71: ...SECTION 16 TROUBLESHOOTING 65 Troubleshooting Flow Chart Linear Double Linear and U Tube...
Page 73: ...SECTION 16 TROUBLESHOOTING 67 Troubleshooting Flow Chart Multiburner...
Page 81: ......