2
R1K 34 /B - RAD - ING - Manuale - 1512.2_CSA_TTS
SUMMARY
SUMMARY
INTRODUCTION
4
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. UNPACKING
10
1.1.5. OVERALL DIMENSIONS
(inch)
11
1.1.6. PIPING LAYOUT/IDENTIFICATION
11
1.1.7. HYDRAULIC CONNECTION KIT
11
1.1.8. POSITIONING AND CLEARANCES TO COMBUSTIBLE MATERIAL AND SERVICE CLEARANCES
12
1.1.9. CIRCULATOR PERFORMANCE CURVES
13
1.1.10. WATER CONNECTIONS
14
1.1.11. PRESSURE RELIEF VALVE KIT
15
1.1.12. SYSTEM FILLING
16
1.1.13. FILLING THE CONDENSATE COLLECTION SIPHON
17
1.1.14. ANTI-FREEZE PROTECTION
19
1.1.15. GAS CONNECTION
20
1.1.16. ELECTRICAL CONNECTION
20
1.1.17. POWER SUPPLY
21
1.1.18. OPTIONAL ELECTRICAL CONNECTIONS
22
1.1.19. DHW SENSOR INSTALLATION
24
1.1.20. VENTING
25
1.1.21. TYPES OF EXHAUST SYSTEMS
27
1.1.22. TABLE 1: ALLOWABLE VENT LENGTHS
32
2. SEZIONE CENTRO ASSISTENZA
33
2.1. FIRST START-UP
34
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
34
2.1.2. BOILER COMMISSIONING
35
2.1.3. CO2 VALUE CHECK AND CALIBRATION
36
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
37
2.1.5. DIGITECH CS (MIAH402) PARAMETERS TABLE
39
2.1.6. COMBUSTION BLOWER FREQUENCY/HEAT CAPACITY DIAGRAM
45
2.2. MAINTENANCE
46
2.2.7. GENERAL MAINTENANCE WARNINGS
46
2.2.8. TECHNICAL DATA
47
2.2.9. TECHNICAL ASSEMBLYTECHNICAL ASSEMBLY
49
Summary of Contents for R1K 34
Page 6: ......
Page 62: ......
Page 65: ...65 R1K 34 B RAD ING Manuale 1512 2_CSA_TTS 3 USE USER...
Page 66: ...66 R1K 34 B RAD ING Manuale 1512 2_CSA_TTS 3 USE USER...
Page 67: ...67 R1K 34 B RAD ING Manuale 1512 2_CSA_TTS 3 USE USER...
Page 68: ...68 R1K 34 B RAD ING Manuale 1512 2_CSA_TTS 3 USE USER...
Page 79: ......