3
R2K 34 RAIN - RAD - ING - Man.Inst. - 1901.1_V3_firm.L224C_AHS
R2K 34 RAIN_Man.Ins
t._AHS_EN
TABLE OF CONTENTS
TABLE OF CONTENTS
INTRODUCTION
5
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. UNPACKING
10
1.1.5. POSITIONING AND MINIMAL TECHNICAL SPACES
11
1.1.6. OVERALL DIMENSIONS
13
1.1.7. JIG
13
1.1.8. CIRCULATOR PREVALENCE/FLOW DIAGRAM
14
1.1.9. CHECK LIST
15
1.1.10. HYDRAULIC CONNECTION
16
1.1.11. SYSTEM FILLING
17
1.1.12. FILLING THE CONDENSATE COLLECTION SIPHON
18
1.1.13. ANTI-FREEZE PROTECTION
19
1.1.14. GAS CONNECTION
20
1.1.15. ELECTRICAL CONNECTION
20
1.1.16. POWER SUPPLY
21
1.1.17. OPTIONAL ELECTRICAL CONNECTIONS
22
1.1.18. FUME EXHAUST FITTINGS
24
1.1.19. TYPES OF FUME EXHAUST SYSTEMS
26
2. SUPPORT CENTRE SECTION
29
2.1. FIRST START-UP
30
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
30
2.1.2. BOILER COMMISSIONING
31
2.1.3. CO2 VALUE CHECK AND CALIBRATION
32
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
33
2.1.5. DIGITECH CS PARAMETERS TABLE
35
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
43
2.2. MAINTENANCE
44
2.2.7. GENERAL MAINTENANCE WARNINGS
44
2.2.8. TECHNICAL DATA
46
2.2.9. TECHNICAL ASSEMBLY
48
2.2.10. HYDRAULIC BOARD
49
2.2.11. 3-WAY VALVE OPERATION
50
2.2.12. WIRING DIAGRAM
51