INSTALLATION INSTRUCTIONS
13
B
C
A
3.3 Unpacking
■
The materials (cardboard) used for packing the appliance are fully recyclable.
■
It is recommended that the packing material is only removed prior to installing the boiler. The
manufacturer will not be held responsible for damage caused by incorrect storage of the product.
■
Packing materials (plastic bags, polystyrene, nails, etc.) must not be left within reach of children, in that
these items represent a potential hazard.
A. Place
the
packed
appliance on the floor (see fig.
1) making sure that the "up”
arrow is facing down. Remove
the staples and open out the
four flaps of the box.
B. Rotate the boiler 90° while
manually supporting it from
underneath
C. Lift the box and remove the
protections. Lift the boiler by
grasping the rear part and
proceed with the installation.
STORAGE & HANDLING
Please note that prior to
installation the Radiant boilers
should be stored in the
horizontal position with no
more than three boilers to a
stack;
Ensure that the boilers are
stored in dry conditions and be
aware that the carton is a tow-
man lift;
Fig. 1
Summary of Contents for RK 34/B Ekobox
Page 2: ......