background image

Installation Manual 

 

COMBI  -  TA01A011.B1003 

 

 

7

Available head with by-pass partially (50%) on.

2

Available head at top speed.
Available head at second speed.

II

0

III

0

1

200

400

800

600

1000

3

4

5

6

Head m c.w. 6

1800

Flowrate litres/h

1400

1200

II

1600

III

GAS CONNECTIONS 

The gas supply must be connected up by 
qualified person. 

The following standards must be complied 
with: UNICIG 7131/72 and UNICIG 7129/92 

(of 21/04/93) 
Before installing the boiler, make sure of the 
following: 

 

the pipeline must be of an adequate 
section and length to carry the flow 

required and must be fitted with all safety 
devices and measures prescribed by 
current norms; 

 

before turning on the boiler make sure the 
type of gas which it is designed to run on 

is available  

 

the gas supply pressure must lie within the 
values shown on the plate it is 
recommended that the gas supply pipeline 
should be checked for residual 

obstructions before installing the boiler; 

 

where the internal gas supply pipe meets 
the boiler, a gas shutter cock must be 
fitted which has the same diameter as the 
gas inlet pipe; 

 

check thoroughly that the gas inlets and 
outlets are properly sealed. 

 

conversion to allow the boiler to run on 
LPG to natural gas or vice versa must be 
carried out by a qualified gas fitter in 

accordance with law no.46 of 5th March 
‘90 (see p.18). 

 
ANTI-FREEZE SYSTEM  

 

ANTI-FROST SYSTEM  
Radiant boilers are equipped with an Anti-
Freeze system which comes into operation when the temperature falls to 5° C (Heating sensor) and 4° C (Hot water sensor) and 

protects the boiler down to –10°C external temperature.                                         
To protect the internal Radiators, a room thermostat or remote control must be fitted. 

 

NOTE

The frost system will only come into operation if the boiler is filled with water, and connected to a live gas supply, with 

electrical supply and boiler controls in the “ON” position (With the Main switch turned to Summer or Winter position) 

and the gas 

supply turned on. 

 

 

N.B.

 For external installations, see instructions at page 6.  

 

FOR THE INSTALLER 

For boilers installed outdoors, where the temperature may drop below -2° degrees Centigrade, the system should be filled with 
antifreeze liquid by an authorised technician and a set of electrical heating elements should be fitted to protect the domestic hot water 

heat exchanger.

 

 

ADVICE FOR THE SERVICE TECHNICIAN 

If the boiler is out of service because it is frozen, check that no parts have been locked in position by ice before putting it into 

operation.  
It is advisable to empty the boiler and the system in case of no operation for a long period.

 

 

Recommended percentage of glycol for temperatures down to - 8°C is 20%.

The antifreeze liquid used must be of a good make and in 

a solution which has already been diluted to avoid the risk of uncontrolled dilution.  

Table n°1 

 

 

Antifreeze Temperature 

 

Ethylene glycol  

(%) volume  

freezing point 

 (°C) 

boiling point   

 (°C) 

10 - 

4 101 

20 -10 102 

 

Recommended Glycol 20% percentage for temperatures down to –8°C.  

Circulating pump RSL 15/6-3 

Summary of Contents for RSF 30

Page 1: ...A01A011 B1003 Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY ENGLISH INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 30 E TYPE C ROOM SEALED SEDBU...

Page 2: ......

Page 3: ...EM page 3 GENERAL INSTALLATION REQUIREMENTS page 4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 13 BOILER CONTROL PANEL page 9 STARTING UP THE BOILER FOR THE FIRST TIME page 9 MULTIGAS OPE...

Page 4: ...ion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be performed by...

Page 5: ...TU h 57774 Heating temperature adjustment C 30 80 Max working pressure heating bar 3 Min working pressure heating bar 0 3 Expansion vessel capacity initial pressure 1 bar Litres 10 Hot water flow rate...

Page 6: ...USE ORIGINAL RADIANT APPROVED FLUE KIT SYSTEMS FLUE ACCESSORIES AND FLUE DIAPHRAGMS ONLY APPROVED RADIANT FLUE DIAPHRAGMS AND ADJUSTMENT TABLES ARE SUPPLIED WITH RADIANT ORIGINAL FLUE KIT SYSTEMS R C...

Page 7: ...ework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above code...

Page 8: ...re the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed guard...

Page 9: ...lation the boiler is equipped with a fittings kit see fig 3 IMPORTANT Before connecting the heating system pipes carefully clean the system to prevent residual dirt from entering into circulation and...

Page 10: ...with an Anti Freeze system which comes into operation when the temperature falls to 5 C Heating sensor and 4 C Hot water sensor and protects the boiler down to 10 C external temperature To protect the...

Page 11: ...strument panel as follows A Turn off the electrical power supply at the mains B Remove the boiler front casing C Undo the two screws on the panel and turn it to the position shown in fig 1 pos 1 D Aft...

Page 12: ...utral and earth connections have been properly connected make sure the type of gas being supplied is the same as the type for which the boiler has been tested and approved see plate data make sure the...

Page 13: ...N position and try the ignition procedure once again If the boiler does not start reset boiler and Set the ON OFF switch 1 to OFF and then ON position IMPORTANT should the boiler fail to ignite wait 3...

Page 14: ...ed d calibrate the new max and min settings for the modulator e replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler When converting the boiler to work with...

Page 15: ...Y THERMOSTAT 9 ELECTRONIC GAS VALVE VK4105 10 ELECTRONIC IGNITION BOARD 11 EXPANSION VESSEL 12 3 SPEED CIRCULATION PUMP WITH AIR VENT 13 AUTOMATIC AIR VENT 14 HEATING CIRCUIT 3 bar PRESSURE RELIEF VAL...

Page 16: ...C M1 1 2 3 4 brown light blue IG black black 17 1 PWM 12 light blue 10 11 grey black RS light blue brown 13 14 16 15 L 12 11 9 10 8 7 6 5 4 3 2 N 56 1bar PAC brown black M3 55 brown brown light blue b...

Page 17: ...tion can be made to either the remote control fig 5 or to the terminal block fig 3 dotted line on the terminals marked SE SE WARNING The remote control connection cable must pass through a channel whi...

Page 18: ...odulation Check that the electrical connection conforms to the description in the instruction manual for the boiler Check the domestic hot water flow rate and temperature When dismantling the boiler c...

Page 19: ...230V ES 30 108 G 00 0416 9 43157LP SEALING CLIPS KIT FOR MULTIPLEX GROUP 9 58009LP MAIN HEAT EXCHANGER mod 30 000 kCal h 9 59012LP AIR PRESSURE SWITCH CE C6065FH1748B 9 59015LA WATER PRESSURE SWITCH...

Page 20: ...LET HAVE BEEN CAREFULLY PREPARED BUT WE RESERVE THE RIGHT TO MAKE CHANGES AND IMPROVEMENTS IN OUR PRODUCTS WHITCH MAY AFFECT THE ACCURANCY OF THE INFORMATION CONTAINED IN THIS LEAFLET E OE ALL RIGHTS...

Reviews: