60
Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: radijator@radijator.rs
8.
Starting the CUBA
water pellet stove and maintenance
The first initiation of the boiler is performed by the technician
who has the certificate issued by Radiator inzenjering.
Training of the boiler’s user is mandatory.
In that way, that person is licensed to report the initiation time
and the first initiation status of the boiler to the maintenance
department in the factory, while keeping a copy of the initiation
report. The warranty and user manual are given to the buyer. One
copy of the warranty is sent to the manufacturer.
If the warranty isn’t followed, it isn’t valid.
Only boilers initiated by the licensed technician are subjected to the
conditions of the complete 2-year warranty. If the boiler user forgets
to shut the boiler down (e.g. cleaning), he/she will be able to initiate
the boiler again on his/her own and the following serves as a
reminder.
Parameters for the boiler operation, available to the user,
are located on the display. Other parameters in the so-called
hidden menu shouldn’t be changed without the consent of the
technician who initiated the boiler or of the factory itself.