Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: radijator@radijator.rs
59
Figure 12. Main switch
14.
Before firing the boiler, the lower door has to be slightly opened. It is also important for the
primary air flap to be open, while the secondary air flap has to be closed.
(Figure 13)
This can
be verified by removing the mask located between the upper and lower doors of the boiler. The
mask can be simply removed by slightly lifting it upwards and pulling it towards you.