13
Intr
oduction
Oper
ation
Configur
ation
Tapacul
o 365
Maint
enanc
e
Cus
tomer Servic
e
Inf
ormation
HT
TP R
adionode
Pr
ot
oc
ol V2
Or
der Lis
t
About this Manual
Ins
tallation
4.
Tighten the gland firmly.
5.
Cover the front panel and tighten the screws.
S
W
POW
ER
ON/O
FF
6.
There Data Logger is equipped with a magnet at the rear. Place
the Data Logger on a steel panel.
If necessary, use screws to secure. There are three screw holes on
the back of the device.