6 Steps to Operation
20
EPC-2322 SBC (P3000(D)BX2 Series)
Service Manual
Step 5: Power-On the System
Overview
After you have installed the P3000(D)BX2 and connected all devices, power-on the
system.
No Power
If the system does not power-on, check all power connections, the power source and the
jumper settings (see Step 1: Check Jumper Settings on page
If power connections are secure, the power source is adequate, and the jumper settings
are correct, contact Technical Support. See “Customer Support,”
Start-up
After you power-on the system, it will:
•
Execute the Power-On Self Test (POST) to ensure that the system is functional and
properly configured.
•
Start the operating system.
Setup
During the POST, you can access the Setup Utility (
) to configure the system.
Before using the SBC for the first time, you should verify the system settings
in the Setup Utility. See
StockCheck.com
Summary of Contents for P3000BX2 Series
Page 14: ...Introduction 6 EPC 2322 SBC P3000 D BX2 Series Service Manual Notes S t o c k C h e c k c o m...
Page 62: ...Technical Data 54 EPC 2322 P3000 D BX2 Series Service Manual Notes S t o c k C h e c k c o m...
Page 64: ...Technical Data 56 EPC 2322 P3000 D BX2 Series Service Manual Notes S t o c k C h e c k c o m...