Page 18 of 22
IN063 Rev.D 0120
3 Saber Way, Ward Hill, MA 01835 | radonaway.com
3. Retesting
After the AIRaider
TM
installation, the installer should perform another water analysis to ensure
proper system performance. This sample should be performed one week after the date of installation.
Sampling Procedure:
1. Remove aerator from faucet or spigot, if applicable.
2. Run water so that the AIRaider
TM
operates for two cycles.
3. Turn off water for 5 minutes.
4. Turn water on and proceed with sampling as per the laboratory instructions.
4. Maintenance
Proper maintenance of the AIRaider
TM
can prevent possible system failure and provide years of
trouble-free service.
4.1. Six Month Service (recommended)
The following procedures should be followed to maintain the AIRaider
TM
:
• Check and/or clean the blower air intake filter.
•
Check and/or clean any filters or strainer installed on the inlet line to the AIRaider
TM
. In
installations
with particularly high levels of sediment, cleaning of filters may be required
more frequently.
• Check and clean inlet screen on pump.
• Using a wet/dry vac, clean sediment from bottom of aeration tank if necessary.
• Clean (if necessary) tank and diffusers of all mineral buildup.
• Chlorinate tank and lines by pouring ¼ cup of chlorine into the first aeration chamber.
• Check all control panel connections and electrical components (blower, pump, timer, fuses, etc.) for
proper operation.
•
Check float switches for proper operation.
• Inspect vent line for possible obstructions.
• Run system through two cycles to ensure good working order.
RETESTING AND MAINTENANCE
1
2
3
4