30.11.2. Procedure of control completion
Completion of control realized in accordance with internal criteria may be
carried out in two ways:
•
Automatically
All samples control – number of controlled samples accordant with
declared value in
<Sample quantity>
parameter. On completion of the
control a process summary is generated (see point 30.8 of this manual).
The control is automatically saved to database.
•
Manually
Pressing beforehand defined key
(finish the control). When the
key is pressed the following message is displayed.
Pressing
key
means getting back to the control in progress.
Pressing
key means finish of the control. Finish of control results
in getting back to
PGC
mode setting window.
Caution:
Pattern and example of a report on control is described in point 30.14 of this
manual.
30.12. Simultaneous carrying out two control processes
The scale enables carrying out two control processes at the same time.
The option is enabled in:
•
Go to local mode settings and set parameter
<
Number
of accessible controls>
to value
2
(two controls),
170