RADWIN
2000
C
Plus
User
Manual
Release
3.5.70
3
‐
1
Chapter
3:
Site
Survey
Planning
the
Link
Site
Overview
Link
site
planning
consists
of
a
set
of
surveys,
which
must
be
carried
out
before
any
equipment
is
brought
to
the
site.
If
for
some
reason,
the
outcome
of
any
of
these
surveys
is
negative,
site
re
‐
location
will
need
to
be
considered.
A
Site
Survey
consists
of
three
stages:
1. Preliminary
survey
‐
The
proposed
link
is
analyzed
in
the
office
using
a
topographic
map.
2. Physical
survey
‐
The
locations
of
the
indoor
and
outdoor
equipment
are
determined
on
‐
site
.
3. Radio
Frequency
(RF)
survey
‐
It
is
recommended
that
the
installation
area
be
scanned
with
a
spectrum
analyzer,
to
identify
RF
interference
so
as
to
determine
a
clear
channel
for
radio
installation
(
on
‐
site
).
The
Site
Survey
Introduction
RADWIN
wireless
links
must
be
planned
before
installation.
The
designated
installation
site
must
be
appraised
to
determine
that
the
wireless
system
is
able
to
operate
efficiently
and
provide
connectivity
without
signal
degradation.
RADWIN
2000
C
Plus
offers
a
wide
operating
frequency
range.
A
free
frequency
channel
must
be
determined
within
the
operating
range,
for
optimum
performance.
Summary of Contents for 2000 C PLUS
Page 1: ...USER MANUAL RADWIN 2000 C PLUS POINT TO POINT BROADBAND WIRELESS Release 3 5 70...
Page 17: ...Part 1 Basic Installation Release 3 5 70...
Page 139: ...Part 2 Site Synchronization Release 3 5 70...
Page 166: ...Part 3 Advanced Installation Topics Release 3 5 70...
Page 167: ...RADWIN 2000 C Plus User Manual Release 3 5 70 12 1 Chapter 12 Reserved...
Page 188: ...RADWIN 2000 C Plus User Manual Release 3 5 70 17 1 Chapter 17 Reserved...
Page 189: ...Part 4 Field Installation Topics Release 3 5 70...
Page 219: ...Part 5 Product Reference Release 3 5 70...
Page 296: ......