RADWIN
5000
HPMP
User
Manual
Release
3.5.70
7
‐
1
Chapter
7:
Operating
Under
the
FCC
Unrestricted
Contention
Based
Protocol
Scope
of
this
Chapter
http://
wireless.fcc.gov/services/index.htm?job=service_home&id=3650_3700
.
See
also,
hraunfoss.fcc.gov/edocs_public/attachmatch/FCC
Bringing
up
a
Sector
The
HBS
for
FCC
UCBP
is
pre
‐
configured
for
this
regulation
only.
Activation
is
the
same
as
for
other
RADWIN
5000
products.
Following
activation,
the
HBS
will
find
its
HSUs
in
the
usual
way.The
only
additional
requirements
are
two
extra
parameters
to
be
set
in
the
Configuration
Air
Interface
tab:
Summary of Contents for 5000 HPMP
Page 1: ...USER MANUAL RADWIN 5000 POINT TO MULTIPOINT BROADBAND WIRELESS Release 3 5 70...
Page 21: ...Part 1 Basic Installation Release 3 5 70...
Page 69: ...Part 2 Sector Installation Release 3 5 70...
Page 155: ...Part 3 Sector Management Release 3 5 70...
Page 197: ...RADWIN 5000 HPMP User Manual Release 3 5 70 8 42 Nomadic...
Page 252: ...RADWIN 5000 HPMP User Manual Release 3 5 70 11 8 Registering HMUs 3 Open the Air Interface tab...
Page 290: ...Part 4 Site Synchronization Release 3 5 70...
Page 319: ...RADWIN 5000 HPMP User Manual Release 3 5 70 16 7 Configuring the GSU...
Page 320: ...Part 5 Advanced Installation Topics Release 3 5 70...
Page 354: ...Part 6 Field Installation Topics Release 3 5 70...
Page 396: ...Part 7 Product Reference Release 3 5 70...
Page 517: ......