RADWIN
5000
HPMP
User
Manual
Release
3.5.70
4
‐
15
Regulatory
Considerations
for
HSUs
Regulatory
Considerations
for
HSUs
Hardware
Installation
Workflow
for
a
RADWIN
5000
Sector
Installing
the
Base
Station
Site
Survey
The
Site
Survey
is
carried
out
as
described
in
.
Recall
that
the
Site
Survey
has
three
main
steps:
•
Stage
1:
Preliminary
Survey
•
Stage
2:
Physical
Survey
•
Stage
3:
RF
Survey
Site
preparation
Site
Preparation
includes
‐
•
Obtaining
any
necessary
legal
and
statutory
permits
for
installation
of
radio
equipment
•
Clearing
physical
obstructions
as
far
as
possible
•
Erecting
a
mast
or
tower
if
required.
A
mast
‐
sited
ODU
typically
uses
a
pole
attached
to
the
mast.
•
Installing
a
pole
on
a
building
wall
if
required
•
Constructing
a
weather
‐
proof
cabinet
to
house
a
PoE
device
if
it
is
not
to
be
housed
indoors
•
Ensuring
availability
of
power,
typically
standard
local
AC
power
•
Ensuring
that
there
is
a
LAN
cable
in
place
from
the
user’s
switch
to
the
PoE
location
Warning
When
installing
an
AC
powered
HSU
:
To
maintain
Overvoltage
(Installation)
Category
II,
install
a
suitable
surge
suppressor
device
in
the
branch
circuit
to
limit
expected
transients
to
Overvoltage
Category
II
values.
The
limits
are
based
on
IEC60664
and
are
also
located
in
Table
2H
of
UL60950
(for
mains
≤
150V,
the
transient
rating
is
1500V;
for
150V
<
mains
≤
300V,
the
transient
rating
is
2500V;
and
for
300V
<
mains
≤
600V,
the
transient
rating
is
4000V).
Caution
For
operation
of
the
RADWIN
55xx
HSU
under
FCC/IC
Regulations:
When
operating
the
device
with
certain
29
dBi
dish
antennas,
the
Tx
power
may
be
no
more
than
23
dBm
in
the
frequency
channel
5845
MHz
for
5
and
10
MHz
channel
bandwidth.
Please
check
with
RADWIN
Customer
Service
for
antenna
models
subject
to
this
requirement.
All
other
frequencies
may
operate
using
maximum
Tx
power
of
25
dBm.
Summary of Contents for 5000 HPMP
Page 1: ...USER MANUAL RADWIN 5000 POINT TO MULTIPOINT BROADBAND WIRELESS Release 3 5 70...
Page 21: ...Part 1 Basic Installation Release 3 5 70...
Page 69: ...Part 2 Sector Installation Release 3 5 70...
Page 155: ...Part 3 Sector Management Release 3 5 70...
Page 197: ...RADWIN 5000 HPMP User Manual Release 3 5 70 8 42 Nomadic...
Page 252: ...RADWIN 5000 HPMP User Manual Release 3 5 70 11 8 Registering HMUs 3 Open the Air Interface tab...
Page 290: ...Part 4 Site Synchronization Release 3 5 70...
Page 319: ...RADWIN 5000 HPMP User Manual Release 3 5 70 16 7 Configuring the GSU...
Page 320: ...Part 5 Advanced Installation Topics Release 3 5 70...
Page 354: ...Part 6 Field Installation Topics Release 3 5 70...
Page 396: ...Part 7 Product Reference Release 3 5 70...
Page 517: ......