RADWIN
5000
HPMP
User
Manual
Release
3.5.70
4
‐
21
Installing
the
Base
Station
Figure
4
‐
28:
Basic
use
of
lightning
protectors
To
install
a
LPU
on
a
pole
adjacent
to
an
ODU
(HBS
or
HSU):
1.
Mount
one
LPU
on
the
ODU
pole,
as
close
as
possible
to
the
ODU.
2.
Ground
the
LPU
to
the
pole
using
the
grounding
lug.
3.
Connect
the
0.5
meter
CAT
‐
5e
cable
to
the
IDU
port
of
the
ODU.
4.
Connect
the
other
end
of
the
cable
to
the
top
of
the
LPU.
5.
Tighten
the
top
cable
LPU
gland
cap.
6.
Connect
the
main
ODU
‐
IDU
cable
from
the
IDU
to
the
bottom
end
of
the
LPU.
7.
Tighten
the
bottom
cable
LPU
gland
cap.
8.
Run
the
main
ODU
‐
IDU
cable
towards
the
IDU
location.
9.
Insulate
both
LPU
connections.
See
the
next
section,
below
.
Summary of Contents for 5000 HPMP
Page 1: ...USER MANUAL RADWIN 5000 POINT TO MULTIPOINT BROADBAND WIRELESS Release 3 5 70...
Page 21: ...Part 1 Basic Installation Release 3 5 70...
Page 69: ...Part 2 Sector Installation Release 3 5 70...
Page 155: ...Part 3 Sector Management Release 3 5 70...
Page 197: ...RADWIN 5000 HPMP User Manual Release 3 5 70 8 42 Nomadic...
Page 252: ...RADWIN 5000 HPMP User Manual Release 3 5 70 11 8 Registering HMUs 3 Open the Air Interface tab...
Page 290: ...Part 4 Site Synchronization Release 3 5 70...
Page 319: ...RADWIN 5000 HPMP User Manual Release 3 5 70 16 7 Configuring the GSU...
Page 320: ...Part 5 Advanced Installation Topics Release 3 5 70...
Page 354: ...Part 6 Field Installation Topics Release 3 5 70...
Page 396: ...Part 7 Product Reference Release 3 5 70...
Page 517: ......