Chapter 3
Installation and Setup
This section describes the installation, alignment, and setup procedures
for a WinLink system.
Site Requirements and Prerequisites
For the IDU units, allow at least 90 cm (36 in) of frontal clearance for
operating and maintenance accessibility. Allow at least 10 cm (4 in)
clearance at the rear of the unit for signal lines and interface cables.
The ambient operating temperature should be –45 to 60
°
C/–49 to
140
°
F (ODU), or –5 to 45
°
C/23 to 113
°
F (IDU) at a relative humidity of
up to 90%, non-condensing.
Package Contents
The WinLink packages include the following items:
ODU package containing:
•
ODU
•
Mast/Wall mounting kit plus mounting instructions
•
CD-ROM [WinLink™ 1000 Manager, Installation and Operation
Manual, and Link Budget Calculator]
•
Self adhesive label showing the MAC address and the
alternative community string KEY. Keep this label safe.
•
Spare RJ-45 connector
IDU-E or IDU-R package containing:
•
IDU-E or IDU-R
•
AC/DC Converter
•
IDU wall-mounting drilling template
•
Self adhesive label showing the IDU LED operation
•
Spare RJ-45 connector
IDU-C Package containing:
•
IDU-C