4 / 14
1. Setup the display base as shown in picture.
Insert the tubes into the sockets, no gluing is
required. For greater stability glue joints with CA.
Installation and Rigging Guide
2. Setup the keel, water-proof rubber piece and
ballast by HM 5x25mm screw, using a H 4.0mm
allen key.
3. Setup the keel, water-proof rubber piece into
hull by HM 5x50mm screw, using a H 4.0mm
allen key.
4. Insert the rudder from hull bottom to deck
through a rudder arm, connected with a clip,
make sure rudder is able to rotate freely. Then
insert push rod through the connector on rudder
arm, rudder in center position and tighten the
allen screw with a H 2.0mm allen key.
5. Unroll main sail and install 1 Luff ring in each
of the three
grommets. Slide the long mast through
5. Slide the 4 lower Luff rings onto the long mast
and plug the aluminum tube into the bottom of the
mast.
Summary of Contents for Eclipse 1M
Page 3: ...Contents 3 14...
Page 14: ...Limited Warranty Printed in China Eclipse boat...