16. Locate the line storage board. A and B
are the fore and aft main mast tension lines.
The rest are the 3 sets of main mast lateral
tension lines.
14. Slide the bowsie to tighten the line in
order to position the jib in front of the main
mast.
6 / 14
1
2
3
4
15. Thread the jib sail control line through
the 3 deck eyelets as shown in the photo
above. Hook the loop on the same clevis as
the main sail control line. Latch the clevis.
13. Attach clevis to the front silicone ring on
the jib boom.
17. Photo shows the forward main mast
tension line. Attach the line by passing the
loop end through the fitting and then thread
the long end of the line through the loop and
pull tight. The clevis end attaches to the deck
eyelet at the bow.
18. The 3 sets of lateral main mast support lines
attach at the 2 mast joints as well at the top of the
mast. After installation each should be tightened
equally.
Summary of Contents for Eclipse 1M
Page 3: ...Contents 3 14...
Page 14: ...Limited Warranty Printed in China Eclipse boat...