11
RailKing 0-8-0 Switcher Steam Engine
The locomotive’s internal gearing was greased at the factory and should not
need additional grease until after 50 hours of operation or one year, whichever
comes first. To access the gear box, do the following:
1. Turn the engine upside down.
2. Remove the Phillips screw (marked “GREASE”) located at the third set of
drivers (counting from the front of the engine).
3. Use a grease tube dispenser to put a small amount (approx. 1-2 ml.) of
lithium-based grease into the gearbox.
4. Replace the screw.
Body Mount Screws
Body Mount Screws
Grease Screw (G)
Figure 4. Greasing Points on the Engine and Body Mounting Screws