The locomotive’s internal gearing was greased at the factory and should not need
additional grease until after 50 hours of operation or one year, whichever comes first.
To access the gear box and axles, do the following:
1. Turn the engine upside down and remove the truck bottom plate mounting screws
(shown below).
2. After removing the truck bottom plate mounting screws, liberally apply grease to the
gears attached to both the outside axles (shown below).
Figure: Body Mount Screws and Lubrication Points on the Locomotive
Grease Points Inside Power Truck
Mounting Screws
RailKing One-Gauge SD70ACe Diesel Engine w/Proto-Sound® 3.0
38
Lubricate All Wheel Axles (L)
Maintenance
Lubricating and Greasing Instructions
The engine should be well oiled and greased in order to run properly. Regularly lubricate
ALL axles and pickup rollers to prevent squeaking. Use light household oil, such as that
found in M.T.H.’s maintenance kit. Do not over oil. Use only a drop or two on each
pivot point.
Body Mount Screws
Body Mount Screws
Body Mount Screws
Body Mount Screws
Lubricate All
Wheel Axles (L)
BACK
FRONT