108
ESP-LXD Controller
Test All Stations
You can test all stations connected to your controller by running each
of them in station number sequence.
Sometimes this is useful after installation, for general maintenance or
as a first step in troubleshooting your system.
b
b
NOTE:
Only stations with programmed run times are included in
the Test All Stations operation.
b
g
Turn the controller dial to Manual Watering.
A
The Manual Watering screen appears. Press the Down Arrow
button to select Test All stations; then press Next.
B
The Test All stations screen appears. Press the + and – buttons to
adjust the Test Run Time (adjustable from 1 to 10 minutes) per
station; then press Run.
1
2
C
A confirmation screen appears.
D
Once Run is pressed, stations can be monitored and advanced by
turning the dial to the AUTO position and using the Adv button.
Press the + and – buttons to increase or decrease Run Time
minutes for the current station.
3
4
Summary of Contents for ESP-LXD
Page 1: ...ESP LXD Controller Installation Programming Operation Guide...
Page 6: ...this page intentionally left blank...
Page 34: ...28 ESP LXD Controller this page intentionally left blank...
Page 45: ...39 ESP LXD Controller this page intentionally left blank...
Page 52: ...46 ESP LXD Controller this page intentionally left blank...
Page 82: ...76 ESP LXD Controller this page intentionally left blank...
Page 104: ...98 ESP LXD Controller this page intentionally left blank...
Page 115: ...109 ESP LXD Controller this page intentionally left blank...
Page 134: ...128 ESP LXD Controller this page intentionally left blank...