52"
52"
51 3/8"
1 3/4"
1 3/4"
81"
H108
H1
76
51
H1
H108
H108
H1
49
49
76
75
75
51
H108
H1
77
52
B
A
FACIA INSET
51
52
77
*NOTE: Pre-drill all holes for Lag Bolts with the appropriate drill bit.
*NOTE: Check measurements and ensure Uprights are level and square before continuing
with assembly of the play system.
1. Attach Arched Facias
(51)
to Corner Uprights
(75) (76)
using 5/16" Hardware
(H108)
and 1/4"
Hardware
(H1)
. The tops of the Arched Facias
(51)
should be
81"
up from the bottom of the
Uprights and flush with the tops of the 4 Hole Facia with Rope Hole
(52)
and the Top Joist with
Swing Holes
(77)
.
*NOTE: If installing Double Wall Wave Slide opposite of the swing beam (B), 4 Hole Facia
w/Rope Hole (52) and Arched Facia (51) must be installed (as shown) in Facia
Inset.
2. Attach Main Beams
(49)
to Corner Uprights
(75) (76)
using 5/16" Hardware
(H108)
and 1/4"
Hardware
(H1)
. The top edges of the Main Beams
(49)
should be
51 3/8"
up from the bottom
of the Uprights when properly installed.
*NOTE: Offset counter-sunk holes in Main Beams must be towards the bottom of the set.
*NOTE: Check level of assembly now and periodically throughout construction. It may be
necessary to add or remove some soil from beneath the assembly to level the
play system.
A
B
C
D
20
Step 3
Facia and Deck
Support Assembly