background image

M

anual for Rais Visio 1, Visio 2 and Visio 3 

77 

 

Rev 7  

February 2016 

Approved Document J, to a distance of 30 cm in front of the stove and 15 cm to each side 
measuring from the door of the combustion chamber 

 

 
Combustion air supply 

In order for the stove to perform efficiently and safely there should be an adequate air supply into the room 
in which the stove is installed to provide combustion air.  This is particularly necessary if the room is double
-glazed or a flue draught stabiliser is operating in the same room as the appliance. It may be necessary to 
increase the air vent size in property with low air permeability ( < 5.0 m

3

 /(h.m

2

). 

The provision of air supply to the stove must be in accordance with current Building Regulations Approved 
Document J. An opening window is not appropriate for this purpose. 
IMPORTANT NOTE: If applicable and the appliance is being fitted within an existing fireplace recess,    
specialist advice should be sought before fitting any permanent ventilation within this area. 
 

Connection to chimney 

Stoves may have a choice of either a rear or top flue gas connector that allows connection to either a     
masonry chimney or a prefabricated factory made insulated metal chimney in accordance with their        
instructions. In some cases it may be necessary to fit an adaptor to increase the diameter of the flue to the 
minimum required 150 mm section of the chimney or liner. 
 

Electrical Services 

The installation of any electrical services during the installation of this appliance must be carried out by a 
registered competent electrician and in accordance with the requirements of the latest issue of BS 7671 
 

Carbon Monoxide Alarm 

A carbon monoxide alarm complying with BS EN 50292 must be fitted in the same room as the appliance. It 
should be positioned on the ceiling at least 300mm from any wall or, if it is located on a wall, as high up as 
possible (above any doors and windows) but not within 150mm of the ceiling. The alarm should also be  
between 1m and 3m horizontally from the appliance. 
 

Commissioning and handover 

Ensure loose parts are fitted in accordance with the instructions given in the instruction booklet. 
 
On completion of the installation allow a suitable period of time for any fire cement and mortar to dry out, 
when a small fire may be lit and checked to ensure the smoke and fumes are taken from the stove up the 
chimney and emitted safely to atmosphere. Do not run at full output for at least 24 hours. 
 
On completion of the installation and commissioning ensure that the operating instructions for the stove are 
left with the customer. Ensure to advise the customer on the correct use of the appliance with the fuels 
likely to be used on the stove and warn them to use only the recommended fuels for the stove. 
 
Advise the user what to do should smoke or fumes be emitted from the stove. The customer should be 
warned to use a fireguard to BS 8423:2002 in the presence of children, aged and/or infirm persons. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for VISIO 1

Page 1: ...TION On first lighting the stove you must be careful not to touch the painted surfaces and it is MOST IMPORTANT that the door is kept slightly ajar in order for the door seal and sealant to cure This...

Page 2: ...Manual for Rais Visio 1 Visio 2 and Visio 3 2 Rev 7 February 2016...

Page 3: ...Manual for Rais Visio 1 Visio 2 and Visio 3 3 Rev 7 February 2016...

Page 4: ...Manual for Rais Visio 1 Visio 2 and Visio 3 4 Rev 7 February 2016...

Page 5: ...Manual for Rais Visio 1 Visio 2 and Visio 3 5 Rev 7 February 2016...

Page 6: ...Manual for Rais Visio 1 Visio 2 and Visio 3 6 Rev 7 February 2016...

Page 7: ...Manual for Rais Visio 1 Visio 2 and Visio 3 7 Rev 7 February 2016...

Page 8: ...Manual for Rais Visio 1 Visio 2 and Visio 3 8 Rev 7 February 2016...

Page 9: ...Manual for Rais Visio 1 Visio 2 and Visio 3 9 Rev 7 February 2016...

Page 10: ...Manual for Rais Visio 1 Visio 2 and Visio 3 10 Rev 7 February 2016...

Page 11: ...Manual for Rais Visio 1 Visio 2 and Visio 3 11 Rev 7 February 2016...

Page 12: ...Manual for Rais Visio 1 Visio 2 and Visio 3 12 Rev 7 February 2016...

Page 13: ...Manual for Rais Visio 1 Visio 2 and Visio 3 13 Rev 7 February 2016...

Page 14: ...Manual for Rais Visio 1 Visio 2 and Visio 3 14 Rev 7 February 2016...

Page 15: ...Manual for Rais Visio 1 Visio 2 and Visio 3 15 Rev 7 February 2016...

Page 16: ...Manual for Rais Visio 1 Visio 2 and Visio 3 16 Rev 7 February 2016...

Page 17: ...Manual for Rais Visio 1 Visio 2 and Visio 3 17 Rev 7 February 2016...

Page 18: ...Manual for Rais Visio 1 Visio 2 and Visio 3 18 Rev 7 February 2016...

Page 19: ...Manual for Rais Visio 1 Visio 2 and Visio 3 19 Rev 7 February 2016...

Page 20: ...Manual for Rais Visio 1 Visio 2 and Visio 3 20 Rev 7 February 2016...

Page 21: ...Manual for Rais Visio 1 Visio 2 and Visio 3 21 Rev 7 February 2016...

Page 22: ...Manual for Rais Visio 1 Visio 2 and Visio 3 22 Rev 7 February 2016...

Page 23: ...Manual for Rais Visio 1 Visio 2 and Visio 3 23 Rev 7 February 2016...

Page 24: ...Manual for Rais Visio 1 Visio 2 and Visio 3 24 Rev 7 February 2016...

Page 25: ...Manual for Rais Visio 1 Visio 2 and Visio 3 25 Rev 7 February 2016...

Page 26: ...Manual for Rais Visio 1 Visio 2 and Visio 3 26 Rev 7 February 2016...

Page 27: ...Manual for Rais Visio 1 Visio 2 and Visio 3 27 Rev 7 February 2016...

Page 28: ...Manual for Rais Visio 1 Visio 2 and Visio 3 28 Rev 7 February 2016...

Page 29: ...Manual for Rais Visio 1 Visio 2 and Visio 3 29 Rev 7 February 2016...

Page 30: ...Manual for Rais Visio 1 Visio 2 and Visio 3 30 Rev 7 February 2016...

Page 31: ...Manual for Rais Visio 1 Visio 2 and Visio 3 31 Rev 7 February 2016...

Page 32: ...Manual for Rais Visio 1 Visio 2 and Visio 3 32 Rev 7 February 2016...

Page 33: ...Manual for Rais Visio 1 Visio 2 and Visio 3 33 Rev 7 February 2016...

Page 34: ...Manual for Rais Visio 1 Visio 2 and Visio 3 34 Rev 7 February 2016...

Page 35: ...Manual for Rais Visio 1 Visio 2 and Visio 3 35 Rev 7 February 2016...

Page 36: ...Manual for Rais Visio 1 Visio 2 and Visio 3 36 Rev 7 February 2016...

Page 37: ...Manual for Rais Visio 1 Visio 2 and Visio 3 37 Rev 7 February 2016...

Page 38: ...Manual for Rais Visio 1 Visio 2 and Visio 3 38 Rev 7 February 2016...

Page 39: ...Manual for Rais Visio 1 Visio 2 and Visio 3 39 Rev 7 February 2016...

Page 40: ...Manual for Rais Visio 1 Visio 2 and Visio 3 40 Rev 7 February 2016...

Page 41: ...Manual for Rais Visio 1 Visio 2 and Visio 3 41 Rev 7 February 2016...

Page 42: ...Manual for Rais Visio 1 Visio 2 and Visio 3 42 Rev 7 February 2016...

Page 43: ...Manual for Rais Visio 1 Visio 2 and Visio 3 43 Rev 7 February 2016...

Page 44: ...Manual for Rais Visio 1 Visio 2 and Visio 3 44 Rev 7 February 2016...

Page 45: ...Manual for Rais Visio 1 Visio 2 and Visio 3 45 Rev 7 February 2016...

Page 46: ...Manual for Rais Visio 1 Visio 2 and Visio 3 46 Rev 7 February 2016...

Page 47: ...Manual for Rais Visio 1 Visio 2 and Visio 3 47 Rev 7 February 2016...

Page 48: ...Manual for Rais Visio 1 Visio 2 and Visio 3 48 Rev 7 February 2016...

Page 49: ...Manual for Rais Visio 1 Visio 2 and Visio 3 49 Rev 7 February 2016...

Page 50: ...Manual for Rais Visio 1 Visio 2 and Visio 3 50 Rev 7 February 2016...

Page 51: ...Manual for Rais Visio 1 Visio 2 and Visio 3 51 Rev 7 February 2016...

Page 52: ...Manual for Rais Visio 1 Visio 2 and Visio 3 52 Rev 7 February 2016...

Page 53: ...Manual for Rais Visio 1 Visio 2 and Visio 3 53 Rev 7 February 2016...

Page 54: ...Manual for Rais Visio 1 Visio 2 and Visio 3 54 Rev 7 February 2016...

Page 55: ...Manual for Rais Visio 1 Visio 2 and Visio 3 55 Rev 7 February 2016...

Page 56: ...Manual for Rais Visio 1 Visio 2 and Visio 3 56 Rev 7 February 2016...

Page 57: ...Manual for Rais Visio 1 Visio 2 and Visio 3 57 Rev 7 February 2016...

Page 58: ...Manual for Rais Visio 1 Visio 2 and Visio 3 58 Rev 7 February 2016...

Page 59: ...Manual for Rais Visio 1 Visio 2 and Visio 3 59 Rev 7 February 2016...

Page 60: ...Manual for Rais Visio 1 Visio 2 and Visio 3 60 Rev 7 February 2016...

Page 61: ...Manual for Rais Visio 1 Visio 2 and Visio 3 61 Rev 7 February 2016...

Page 62: ...Manual for Rais Visio 1 Visio 2 and Visio 3 62 Rev 7 February 2016...

Page 63: ...Manual for Rais Visio 1 Visio 2 and Visio 3 63 Rev 7 February 2016...

Page 64: ...Manual for Rais Visio 1 Visio 2 and Visio 3 64 Rev 7 February 2016...

Page 65: ...Manual for Rais Visio 1 Visio 2 and Visio 3 65 Rev 7 February 2016...

Page 66: ...Manual for Rais Visio 1 Visio 2 and Visio 3 66 Rev 7 February 2016...

Page 67: ...Manual for Rais Visio 1 Visio 2 and Visio 3 67 Rev 7 February 2016...

Page 68: ...Manual for Rais Visio 1 Visio 2 and Visio 3 68 Rev 7 February 2016...

Page 69: ...Manual for Rais Visio 1 Visio 2 and Visio 3 69 Rev 7 February 2016...

Page 70: ...Manual for Rais Visio 1 Visio 2 and Visio 3 70 Rev 7 February 2016...

Page 71: ...Manual for Rais Visio 1 Visio 2 and Visio 3 71 Rev 7 February 2016...

Page 72: ...Manual for Rais Visio 1 Visio 2 and Visio 3 72 Rev 7 February 2016...

Page 73: ...Manual for Rais Visio 1 Visio 2 and Visio 3 73 Rev 7 February 2016...

Page 74: ...Manual for Rais Visio 1 Visio 2 and Visio 3 74 Rev 7 February 2016...

Page 75: ...with plenty of water Asbestos This stove contains no asbestos If there is a possibility of disturbing any asbestos in the course of installation then please seek specialist guidance and use appropriat...

Page 76: ...or connecting the stove to the chimney but is not suitable for using for the complete chimney The chimney and connecting fluepipe must have a minimum diameter of 150 mm and its dimension should be not...

Page 77: ...e chimney or liner Electrical Services The installation of any electrical services during the installation of this appliance must be carried out by a registered competent electrician and in accordance...

Page 78: ...e room as the appliance If the alarm sounds unexpectedly follow the instructions given under Warning Note above Use of fireguard When using the stove in situations where children aged and or infirm pe...

Page 79: ...overloading can cause excess smoke See Page 9 for Refuelling details Operation with door left open Operation with the door open can cause excess smoke The appliance must not be operated with the appli...

Page 80: ...closed Flueway cleaning It is important that the baffle plate and all the stove flueways are kept clean When burning smokeless fuels they should be cleaned at least monthly When burning other fuels t...

Page 81: ...U K Distributor Robeys Ltd Riverside Goods Road Belper Derbyshire England DE56 1UU Tel 01773 820940 Fax 01773 820477 E Mail info robeys co uk www robeys co uk...

Reviews: