21
Raita
PA bio - biokem
MANUAL - INSTALLATION
Content of the delivery, connercting etc
Piping, ventilation
Electricity
Installation posibilities
Installation in the ground
Other things ground installation
Anhcoring the tanks
Other thing ground installation
Piping connections ,
ventilation
The outgoing pipe of the property's drainage pipe is connected to the incoming coupling of the PA (D110 mm).
Outgoing pipes and overflow from the PA are connected to the drain pipe and lead to a ditch or in infiltration.
The treatment plant has an automatic sampling system (sampling well not needed).
Ventilation to the ceiling (1) if there is no pipeventilation installed alternatively t-connetction pipe between the PA and
the house (2) for ventilation.
Additional infiltration or infiltration with UV treatment etc. is installed according to separate instructions for each unit.