19
Content of the delivery, connercting etc
Piping, ventilation
Electricity
Installation posibilities
Installation in the ground
Other things ground installation
Anhcoring the tanks
Other thing ground installation
ENGLISH
Raita
PA bio - biokem
MANUAL - INSTALLATION
Thank you for choosing a PA waste water treatment plant to
clean your wastewater.
Although it is easy to install and maintain,
it is important to
read through these instructions so that everything goes
well.
By following these installation instructions, the sewage
cleaner is correctly installed and works without problems.
Most of the information from PA waste water treatment, use,
service we have collected on our website, see the link:
(https://www.raita.com/domestic/pa.htm)
There you will find information about:
- Cleaning efficiency
- Technical drawings
- Installation instructions
- service and usage instructions
For further information you are welcome to contact us -
helpdesk@raita.com or our local partner
PA 0,85
Installation
PA 2
PA 3