25
Raita
PA bio - biokem
MANUAL - INSTALLATION
Content of the delivery, connercting etc
Piping, ventilation
Electricity
Installation posibilities
Installation in the ground
Other things ground installation
Anhcoring the tanks
Other thing ground installation
Content of the delivery, connercting etc
Piping, ventilation
Electricity
Installation posibilities
Installation in the ground
Other things ground installation
Anhcoring the tanks
Other thing ground installation
Other things to consider
when installing:
1) Take care of thermal insulation; piping and tanks insulation, if necessary (for example, styrofoam 50-100 mm, lecagrus
or equivalent) of the tank and piping area and on the sides still to frost limit (1), or a larger area than the surface of the
tank dimensions (2), taking into account a 60 degree angle on the presence of frost (isolated from the frost limit with a 60
degree angle to the upper).
2) Ensure that the ventilation / inlet pipe's maintenance capability (3) (if necessary) with a T-piece in the incoming pipe.
3) Make sure that abundance floods are with sufficient slope.
4) Vibrate ground layers, especially under all the inlet and outlet pipes (4) (20-30 cm in stock)
5) When installing with rubber seal, use a cup or similar drill hole for the right size, dense, vibrate
ground under the pipe.
1)
2)
3)
4)
2)
2)