Installation in the ground
Other things ground installation
Anhcoring the tanks
Other thing ground installation
Other things to consider when
digging installation:
•
drain the trench.
•
perimeter of the container filled with stone-free sand (100-200 mm).
•
Other fillings can be made in general the soil material of the ditch (large stones are removed).
•
The top of the treatment plant must be at least 10 cm higher (the top surface of the lid 20 cm) above the
surrounding ground surface. If the treatment plant's cover is the "pit" (for deeply installed pumping station) is
available in 60 cm elevation parts (1), and 900> 600, 1200> 900 reduction elements (2).
•
Leave a hill (3) so that the rain water does not flow in the tresch.
•
Be sure to direct water with trenches away from the minidrayer
•