background image

Terminating the WCM 

It is important to terminate WCMs correctly otherwise the wired 
system will not function. The termination that is required depends 
on the nature of the installation and the position of the RAK-LINK 
within the system.  
 

No Term - Both Jumpers removed 

Used when the WCM is not at the end of line. This is usually 
identifiable by two cables being punched down to the WCM.  
 

Term - Jumper fitted across 1+2 & 4+5 

Used when the WCM is end of line in a daisy chain configuration. 
For example the WCM marked “TERM” shown in “Typical Wired 
Installation layout” on page one. 
 

Star Term - Jumper fitted across 2+3 & 5+6 

Used when the WCM is end of line in a STAR wire configuration. 
For the example the WCMs marked “STAR TERM” on page one.  

Programming the WCM 

The WCM is programmed using the Rasoft Pro programming software.  A WA/WTC-Bridge 
is required for any programming of a wired system.  
 

Wired system Programming Guide 

- For information on how to programme the wired system 

using Rasoft Pro. 

Troubleshooting the Wired Network 

Sometimes cabling problems or incorrectly punched down cables means a degree of fault 
finding needs to be done on the wired network. The WCMs use backlit LEDs to provide fault 
codes and this can be used in combination with the guides below to resolve problems.  
 

WCM Diagnostic Feedback

 - For fault finding “Daisy Chain” and “Star” configuration. 

 

RAK-LINK diagnostics

 - For fault finding “Daisy Chain” and “Star” configuration. 

 

RAK-STAR diagnostics 

 

 - For fault finding “Star” configuration. 

 

 
 

 

WCM-071

Manual Version 2.0.2 

Reviews: