NOTE:
Remember that everything put into or on the
trailer adds to the load on your vehicle. Also, additional
factory-installed options or dealer-installed options must
be considered as part of the total load on your vehicle.
Refer to “Tire Safety Information/Tire and Loading In-
formation Placard” in “Starting and Operating” for fur-
ther information.
Towing Requirements
To promote proper break-in of your new vehicle drive-
train components the following guidelines are recom-
mended:
CAUTION!
•
Do not tow a trailer at all during the first 500 miles
(805 km) the new vehicle is driven. The engine, axle
or other parts could be damaged.
•
Then, during the first 500 miles (805 km) that a
trailer is towed, do not drive over 50 mph (80 km/h)
and do not make starts at full throttle. This helps
the engine and other parts of the vehicle wear in at
the heavier loads.
4
STARTING AND OPERATING
223
Summary of Contents for Truck 2014
Page 1: ...R a m Tr u c k O W N E R S M A N U A L 2 0 1 4 D i e s e l S u p p l e m e n t...
Page 3: ...RAM DIESEL SUPPLEMENT RAM 1500 3 RAM 2500 3500 4500 5500 119 INDEX 315...
Page 4: ......
Page 5: ...RAM 1500...
Page 6: ......
Page 8: ......
Page 9: ...INTRODUCTION CONTENTS A MESSAGE FROM CHRYSLER GROUP LLC 8 1...
Page 16: ...INSTRUMENT CLUSTER 14 UNDERSTANDING YOUR INSTRUMENT PANEL...
Page 17: ...INSTRUMENT CLUSTER LARAMIE 3 UNDERSTANDING YOUR INSTRUMENT PANEL 15...
Page 36: ......
Page 110: ......
Page 120: ......
Page 121: ...RAM 2500 3500 4500 5500...
Page 122: ......
Page 124: ......
Page 125: ...INTRODUCTION CONTENTS A MESSAGE FROM CHRYSLER GROUP LLC 124 1...
Page 134: ...INSTRUMENT CLUSTER 132 UNDERSTANDING YOUR INSTRUMENT PANEL...
Page 154: ......
Page 239: ...WHAT TO DO IN EMERGENCIES CONTENTS JUMP STARTING 238 With Portable Starting Unit 241 5...
Page 244: ......
Page 290: ......
Page 316: ......
Page 317: ...INDEX...
Page 330: ...Chrysler Group LLC 14D241 226 AA First Edition Printed in U S A...