COPYRIGHT © 2013 SANDVIK MINING AND CONSTRUCTION OY
Page 6 - Operation
Foreword
RD2019 A-JAW, D-JAW, S-JAW, M-JAW
Do not perform any lubrication and maintenance on this machine until you read and
understand the instructions in this manual.
1.4 WARRANTY
The customer is provided with a separate warranty sheet, where the export warranty
terms are explained. Check always that this warranty sheet is provided with the
attachment. If not, contact your local dealer immediately.
WARRANTY REGISTRATION CARD
A warranty registration card is filled out after the installation inspection by the
dealer and a copy of it is sent to the manufacturer. This card is very important
because no warranty claims are handled without it. Make sure that you get a copy
of it after the installation inspection and that it is correctly filled out.
INSTALLATION INSPECTION
An installation inspection must be carried out after the product has been installed on
the carrier. In the installation inspection certain specifications (operating pressure,
oil flow, etc.) are checked so that they are within given limits. See “Product
specifications” on page 78.
1.5 SPARE PART ORDERS
When you need spare parts or some information concerning maintenance to your
machinery, please contact your local dealer. Quick deliveries are ensured by exact
orders.
Required information:
1. Name of customer, contact person
2. Order number (when available)
3. Delivery address
4. Mode of delivery (air mail, etc.)
5. Required delivery date
6. Invoicing address
7. Model and serial number of product
8. Name, number and required amount of spare parts