51
2. DESCRIPTION
The machines in the EPOCA series have been desi-
gned to prepare express coffee and hot beverages.
A positive-displacement pump inside the machine
SRZHUVWKHKHDWHULQZKLFKWKHZDWHULVKHDWHG%\
pressing the appropriate buttons, water is supplied
to the spouts in the form of hot water or steam, ac-
cording to needs.
The water to be used for the beverages is supplied
GLUHFWO\E\WKHZDWHUVXSSO\SUHVVXUL]HGE\WKHSXPS
DQGLPPHGLDWHO\KHDWHGE\WKHVWHDPSURGXFHGE\
the boiler or from an incorporated tank containing a
VRIWHQHUIRUVRIWHQLQJWKHZDWHUE\WUDSSLQJFDOFLXP
salts.
2.1. Specifications and composition
(Fig.3 - 3.a - 3.b)
7KHPDFKLQHLVFRPSRVHGRIDVWHHOFDUU\LQJVWUXF
-
ture on which the mechanical and electrical compo-
QHQWVDUH¿WWHG7KHVHDUHFRPSOHWHO\FRYHUHGZLWK
SDQHOVPDGHRISDLQWHGSRO\XUHWKDQHDQGVWDLQOHVV
steel.
The beverages are dispensed at the front of the
machine, where all the buttons, control devices and
dispensers are to be found.
There is a cup-warming plate on the top of the ma-
chine.
Legend:
A
6HPLDXWRPDWLFV\VWHPPDQXDOGLVSHQVLQJVWDUW
and stop.
B
$XWRPDWLFV\VWHPHOHFWURQLFFRQWURORIFRIIHH
doses dispensed.
C
N. of coffee dispensing units.
D
N. of steam spouts.
E
N. of hot water spouts.
1 Steam tap
2 Steam spout
3 Hot water tap
4 Hot water spout
5 Coffee dispensing unit
6 Coffee dispensing button
7 Boiler water level indicator
8 Gauge
9 Power on-off switch and led
10 Switch and boiler resistance engagement light.
11 Water-tank
12 Water shortage pilot light
2.2. Machine equipment
MOD. E1-S1
MOD. S1 TANK
1 dose filter holder
1
1
2 dose filter holder
1
1
Filters
2
2
Disk for cleaning
1
1
1 mt. supply pipe
1
-
1,5 mt. supply pipe
1
-
1,5 mt. drainage pipe
1
-
Pipe connections
1
1
Doser and presser
1
1
Instruction manual
1
1
Brush
1
1
A
B
C
D
E
E1 (Fig.3)
-
ok
1
1
1
S1 (Fig.3.a)
ok
-
1
1
1
S1 TANK (Fig.3.b)
ok
-
1
1
1
Summary of Contents for EPOCA E
Page 4: ......
Page 6: ......
Page 8: ...8 1 2 3 4 5 6 8 7 9 10 mod S1 Fig 3 a 1 2 3 4 5 6 8 7 9 10 mod E1 Fig 3...
Page 9: ...9 Fig 4 Fig 5 4 L o v a t o L 2 3 8 G 1 30mm 1 2 3 4 5 6 8 7 9 10 12 mod S1 TANK Fig 3 b...
Page 10: ...10 4 mod S1 TANK 3 A B C D E 6 5 7 mod E1 S1 mod S1 TANK 1 2 2 8 8 9 1 Fig 6...
Page 11: ...11 1 2 A B C Fig 7 Fig 8 Fig 9 Fig 10 Fig 11...
Page 12: ...12 1 2 Fig 12 B C 2 1 Fig 13...
Page 35: ......