GUI reference
R&S
®
ZNB/ZNBT
488
User Manual 1173.9163.02 ─ 62
The R&S
ZNB/ZNBT always proposes an optimum solution (minimum number of
assignments) that also minimizes the physical port reconnections required between
calibration stages. For user-modified assignments, it provides assistive information
indicating insufficient, or redundant entries.
The test port connectors are automatically set according to the connector type of the
selected calibration unit port.
Remote command:
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment<Asg>:DEFine
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment<Asg>:DEFine:TPORt
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment:COUNt?
Default Port Assignment
Restores the default port assignments.
Remote command:
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment:DEFine:DEFault
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment:DEFine:TPORt:
DEFault
Start
.
If the configured port assignments are invalid, this action is disabled.
Step 3: SMARTerCal
In the final step, the R&S
ZNB/ZNBT displays a "SMARTerCal" screen that guides the
user through the calibration data acquisition.
1. For each port assignment:
a) Connect the calibration unit to the related set of test ports.
b) Perform an automatic system error correction.
The upper part of the "Cal Unit" screen displays the calibration sweep diagrams for
the currently measured S-parameter. The lower part visualizes the active port
assignment and the measurement progress.
Cal softtool