Getting started
R&S
®
ZNB/ZNBT
23
User Manual 1173.9163.02 ─ 62
3
Getting started
Note
: the following chapters are identical to those in the printed R&S
ZNB/ZNBT Get-
ting Started manual.
.........................................................................................51
......................................................................................78
3.1
Preparing for use
Here, you can find basic information about setting up the product for the first time.
3.1.1
Lifting and carrying
The carrying handles are designed to lift or carry the instrument. Do not apply exces-
sive external force to the handles.
See
"Lifting and carrying the product"
3.1.2
Unpacking and checking
1. Unpack the R&S
ZNB/ZNBT carefully.
2. Retain the original packing material. Use it when transporting or shipping the
R&S
ZNB/ZNBT later.
3. Using the delivery notes, check the equipment for completeness.
4. Check the equipment for damage.
If the delivery is incomplete or equipment is damaged, contact Rohde
&
Schwarz.
3.1.3
Choosing the operating site
Specific operating conditions ensure proper operation and avoid damage to the prod-
uct and connected devices. For information on environmental conditions such as ambi-
ent temperature and humidity, see the data sheet.
See also
Preparing for use