17
55) Remove 16mm bolt x 17mm nut from drawbar
56) Slide drawbar into tube on front of processor, Re-install and tighten 16mm bolt x 17mm nut, loosen 18mm nuts
on 2 retainer bolts, tighten bolts against drawbar, then re-tighten nuts to lock into position
57) Remove 16mm bolts x 17mm nuts from drawbar, install jack and tighten bolts
58) Tighten bolts on drawbar coupler
60) remove 10mm nut, lockwasher and flatwasher from starter solenoid