56.) Install 10mm Bolt & Nut in side of sawdust cover 

 

57.) Install 2 Allan head bolts ion top of cover, tighten all bolts 

 

58.) Remove 2 – 13mm Bolts & Nuts from chainsaw engagement arm 
extension 

 

59.) Attach extension to drawbar and tighten 13mm bolts 

 

60.) Remove 2 – 13mm Bolts, Nuts & Bracket from bottom of engagement 
arm 

 

61.) Put engagement arm in place, install bracket and 2 – 13mm Bolts & 
Nuts, Tighten 

 

Install Handle Extension if needed 

 

62.) Remove 16mm bolt x 17mm nut from drawbar 

 

Summary of Contents for RR27T

Page 1: ...Range Road RR27T Firewood Processor Crated Unit Assembly Manual...

Page 2: ...19mm Nuts and bolts 2 on each leg of top frame 2 Lift top of Metal crate off and move out of work area 3 Remove Shrinkwrap 4 Unwrap Wheels 5 Remove bag containing Bearing washer nut cotter key and ca...

Page 3: ...sawbar engagement arm and extension toolbox fenders 2 bar oil container do not misplace the loose hose towbar jack Log roller Arm Towbar Splitter Wedge Axle Chainsaw Bar Cover Safety Cages 2 Hydraulic...

Page 4: ...install Axle Wheels and Tripod 8 Remove lower crate from work area 9 Install Tripod leg at front of processor 10 Loosen Axle retention Bolts and lock nuts 18mm x 18mm 11 Slide Axle through tube make...

Page 5: ...ard to turn then back the nut off turn until cotter pin hole lines up 17 Insert cotter pin and bend 18 Install hub cap use a rubber mallet to press into place 19 Grease wheel hub generously through gr...

Page 6: ...ured it will damage the rubber it must be pushed down to be level with coupler edge You should not see the keyway above the coupler As shown in the picture the keyway must be tapped down flush with th...

Page 7: ...cover 28 Install 8 10mm bolts and nuts tighten 29 Install Bar Oil Tank onto back of chainsaw safety cover with 13mm nut 30 Remove 10mm bolt and nut from holder above splitting trough keep plastic tub...

Page 8: ...justed to ensure the tension is set correctly Proper chain tension is achieved when the chain can be pulled away from the bar by hand To tighten or loosen the chain the two bolts can be loosened using...

Page 9: ...Position tighten chainsaw actuator tab so it will activate valve when moved can adjust later if needed 44 Adjust bolt on swivel plate in black circle so that when the sawbar is pulled down the bolt h...

Page 10: ...anly and not rubbing connect marked Hoses to corresponding port A to A H to H etc some Units will already have this connected Make sure all hoses are routed cleanly and will not rub 48 Undo 17mm nuts...

Page 11: ...ttery terminal red Black install terminals on battery and snug up 10mm bolts 52 Remove 2 Allan head screws from tabs behind small safety cover 53 Remove 10mm Bolt nut from side of sawdust collector 54...

Page 12: ...op of cover tighten all bolts 58 Remove 2 13mm Bolts Nuts from chainsaw engagement arm extension 59 Attach extension to drawbar and tighten 13mm bolts 60 Remove 2 13mm Bolts Nuts Bracket from bottom o...

Page 13: ...s 66 Tighten bolts on drawbar coupler 67 Remove cotter pin from fixed position roller shaft on log roll arm rollers are not marked so you may have to trial fit to see which roller is in the fixed posi...

Page 14: ...72 Bolt the handle to the adjusting bar with the spring and nut in this position do not tighten 73 Wedge adjustment bar swivel pin slides through tube behind the axle install spring clip 74 With the h...

Page 15: ...this step 76 Open conveyor box remove shrinkwrap from conveyor box includes Conveyor Top Section Lower Section includes Hydraulic pump Top and bottom sections may already be bolted together Belt Top R...

Page 16: ...pin 81 Slide top roller into place 82 Pull belt into position 83 Install lower side extensions lower end mounts with an allan head bolt x17mm nut bolt on motor side is also used to secure chain for l...

Page 17: ...ut safety pins and slowly lower unit adjust leg until conveyor is at desired height attach safety chain to catch at bottom of leg 86 Unfold conveyor so that it is full length pull pin and engage locki...

Page 18: ...f hydraulic oil into tank then unscrew drain plug on bottom of hydraulic tank and drain to flush out any contamination 94 Make sure all return hoses are run the cleanest way so they won t rub or pull...

Page 19: ...in up position Start engine and let idle until engine and hydraulic oil are at operating temperature 101 While engine is warming up adjust conveyor belt to run in center of upper and lower pulleys up...

Page 20: ...it hits the return bar before the ram is fully extended Optional If the customer is only cutting and splitting shorter lengths the bar can be reversed to shorten the stroke and reduce the cycle time T...

Page 21: ...to a period of 90 days from the date of purchase Warranty cancellation Unauthorized modification voids the warranty Including but not limited to welding engine modification pump and hydraulic system...

Reviews: