For technical support, contact us at 1-800-565-5321
C5-BA11-5 Installation Guide
| REV. A1 | Page
10
PHASE 2
– INSTALLATION
2.3 ATTACH PLUS NUTS
2.3.1
• Move the assembled bottle holder on the side.
• Drill all the marks using 1/2" drill bit w/ drill collar, then insert the plus nuts.
WARNING:
Before drilling, ensure that you will not hit any critical parts of the vehicle such as the
Gas tank
,
Wiring Harness
and
Hose
.
NOTE:
Use 1/2" drill bit with drill collar to stop drill at 1/2" depth.
PLUSNUT
DRILL COLLAR
(
seT
aT
1/2
"
)
Drill all the marks then, attach plus nuts to the
holes.
HARDWARE USED
12×
TOOLS
q
Cordless Drill
q
1/2" Drill Bit w/ Drill Collar ( Set at 1/2" )
q
Plus Nut Tool ( 5/16" )
#94-132 Plus Nut