14
16. Route the Pressure Gauge Air line through the hole
in the Base Cabinet and connect it to the Pressure
Regulator located at the rear of the Cabinet.
(See Fig 8.14)
17. Connect the Air Line from the Tilt Back Tower to the
Tee Fitting located Inside the Rear of the Cabinet.
(See Fig 8.15)
18. Reinstall the Side Cover.
Bead Breaker Blade
1. Attach the Bead Breaker Blade to the Bead Breaker
Arm Assembly. Secure the Nyloc nut. (See Fig. 8.16)
Demount Head Assembly
1. Check that the Demount Head Bolt and Allen Screws
are tightened. (See Fig. 8.17)
Fig. 8.14
Fig. 8.16
Fig. 8.15
Fig. 8.17
WARNING!
DO NOT operate the Tilt Tower unless the tool head
is in the LOCKED position. Damage to the machine
and/or property or persons can result if warning
not followed.