RML-600XL ATV / Motorcycle Lift
11
P/N 5900381 — Rev. D — June 2019
Unpack the Components
Use caution when unpacking Lift components. You do not want to damage or misplace anything.
Tip
Consider unpacking the components in the area where you are going to set up the Lift.
The fewer times you move the components, the fewer opportunities there are for
them to get lost, get damaged, or damage the surface they are on.
The Lift comes in two separate containers:
•
One container holds the Platform, the Platform Extension, the Clamp pieces, the Air Pump and
Air Hose, the Dolly, and the Nuts, Washers, and Bolts associated with these items.
•
The second container holds the Side Extensions, their smaller Ramps, and their Nuts, Washers,
and Bolts.
Many of the Lift components come bubble wrapped; remove the bubble wrap.
Each container includes a bag with the necessary Nuts, Washers, Bolts, and other pieces. BendPak
Ranger recommends carefully laying them out near where you are going to set up the Lift so that
they are easily accessible when needed.
Keep the containers away from the area where you are setting up the Lift. They are a tripping
hazards while you are installing the Lift.
Platform Setup
The first step in the installation process is to raise the Platform and engage it on a Safety Lock; this
makes all of the other installation tasks easier to do.
This procedure also sets up the Air Pump and the Main Ramp.
To set up the Platform:
1.
Remove the Platform, Air Hose, Air Pump, and Main Ramp from the shipping container.
Important
:
The Platform is heavy; use great care when moving it.
2.
Using an appropriate lifting device to raise the Platform to full height, then hold it there.
Important
:
Before continuing, double check to make sure the lifting device is securely
holding the Platform at full height.
3.
With the lifting device continuing to hold the Platform at full height, reach under the Platform
and take the Safety Lock Release Handle off the latch on the underside of the Platform.
If desired, you can take the red ball from the parts bag and install it on the end of the Safety
Lock Release Handle.
Continue to have the lifting device hold the Platform at full height.